Tyrone Construction Services recently manufactured and lifted another 30 tonne precast concrete wash bay for Merkanooka Haulage.
The wash bay was manufactured as a large single precast unit, designed to support wash-down operations by capturing and managing runoff in a safe, controlled and durable concrete structure. The unit will be installed on site to support mining operations without the need for extensive in-situ forming works.
Big thank you to WA UNIVERSAL for another successful lift and to Paul from Hynd’s Towing and Haulage for transportation support.
Special mention also for Paul’s YouTube channel ”Truckin’ About”, which will feature more on the transport and delivery of the wash bay.